BIN95 - Manufacturing and Industrial Training

Francais Deutsch Espanol Italiano Portugues Chinese Arabic Russian Japanese Korean

 Business Industrial Network 

Lean Manufacturing from MRO technical support.

Home - Training Services - Training Products - Articles - News - Downloads

Search this Site

industrial

     Site Map

  Bookmark Page

maintenance HOME
electrical  Services  

   Hands-on PLC Training Workshop PLC Training Seminar

   customized on-site PLC training On-Site PLC Training 

   RSLogix Training and simulator PLC Training CBT CD
   industrial engineer PLC Programming

 

  Training material  Training Products 

   educational software licenses discounts Software Licenses 

   CBT Training Software

   5s All Training Products
   Reliability Training Reliability Training CDs  
    PLC Programming  

 

engineering blog Ask the Experts

    

industrial articles  See All Articles

*  RS485 to USB converting

*  Infrared Data Surveys

*  CMMS Systems Integration

    Effective Troubleshooting

    Hazardous Area Installations

    Electrical Troubleshooting

    PLC Management

      

  New Product Releases

*  AB PLC Cables DVD

*  Maintenance Policy 2

*  Reliability PowerPoints 

*  EAM PowerPoints

*  P&S PowerPoints

 

  Downloads

 

  RSS Live News

 

  Live News  

 

  Contact_us
  LinkTo Us

 

(No travel cost for

industrial training, St. Louis.)

 

Member of the BBBOnline Reliability Program

 

True Down Time Cost Analysis - 2nd Edition

Ebook By Don Fitchett and Mike Sondalini

"Costing methods & techniques for manufacturing processes to offer the greatest return on capital employed (ROCE)." 

Training Menu: Products - Contents - Abstracts - Reliability Training - Pocket Guides - Online Store - Why EBooks? - Testimonials - pay pal store alternatives - Affiliate Program - Workstation/Network Corporate pricing packages

AB PLC Cables Video AB PLC Cables and Drivers Video


benchmarking manufacturing process based on true down time cost

Down Time Sample - Contents

True Down Time Cost Analysis - 2nd Edition Ebook
ESBN: F36-047B-2151-10B2
Description:  

True Down Time Costs Analysis focus on costing methods and costing techniques that quantify like activities that previously fell under the indirect cost definition, like the hidden cost of outsourcing, warranties, etc. This technique is a must for bottleneck management, but also should be applied to piece manufacturing and even other industries.

Authors Don Fitchett and Mike Sondalini coauthor the extension of the original Ebook "The true cost of manufacturing down time" (ISBN 1-933047-15-1). With this second edition also comes an action plan to utilize existing shop floor data collection to monitor the many manufacturing processes and associated costs. 

'True Downtime Cost Analysis (TDC)' is the final piece to the lean manufacturing puzzle and a great cost justification tool for maintenance managers and production managers, right up to general managers, to make changes in their operations that move their companies toward using better practices.

The OEE and TEEP chapter discuss this benchmarking process tool from a return on capital employed (ROCE) point of view. In line with the "True" perspective of this Ebook, the authors clarify the proper use of  OEE and TEEP. The action plan chapter ends with a detailed example plan followed by an additional example of implementing TDC in your facility to it's fullest extent.

"The TDC method used reveals many cost saving opportunities that would not be evident using standard time and material cost tracking methods that hide many costs under the indirect cost definition."

Extracts and summaries from this 102 page Ebook have been published as industrial engineering articles in many engineering and management journals as well as industry websites throughout the world.

(Control Engineering, Instrumentation and Control Journal, Facilities Engineering Journal, Pumps & Systems Magazine, Pharma Manufacturing Magazine, Hong Kong Engineer, and more ...)

Email with download link sent immediately after purchase.

Price:  US$29.95

Shop More

Automated download system is powered by our preferred method of payment, secure Pay Pal. (After purchase with 'Buy Now' button above, you immediately receive an email with download link.) If you prefer us to manually process your order or would like to mail or fax order in, please click CD and Book Order Form on our secure servers.

Click for manual order processing, all countries.

(Click on Credit card picture above for manual order processing. Your download link will be emailed within 24 hours with manual processing.)

Industrial manufacturing services provider you can trust.

Table of Contents

  • Introduction to True Down Time Costs (TDC)
  • Getting Started with OEE and TDC.
    • Prioritize:
    • Analysis:
    • Set up OEE and TDC Plant-Wide
  • Overview Of The Metrics
    • Cost Factors Overview
  • A Closer Look at Equipment Categories
    • Cost
    • Data Collection
    • People
    • Product
    • Start-up
    • Bottleneck-Factor
    • Sales Expectation
  • A Closer Look at Labor Categories
    • Labor Per Product (LPP)
    • QC Labor
    • Maintenance Labor
    • Engineering Labor
    • Management Labor
    • Overhead
    • Manufacturing Cost
  • A Closer Look at Down Time Categories
    • Maintenance Time
    • Maintenance Reduced Production
    • Scrap Cost
    • Band-Aid
    • OEM, Outsourcing Service Contractor, Consultants
    • OEM Metrics
    • Machine Tooling Cost
    • Maintenance Parts and Shipping
  • Understanding Overall Equipment Effectiveness (OEE)
    • Benefits of Using Overall Equipment Efficiency
    • Benefits of Using True Downtime Cost
    • Setting OEE base lines (Goals)
    • The Right Way to Use Benchmarking
  • Total Effective Equipment Productivity (TEEP).
    • Where to start with TEEP?
  • Standards for Downtime Factors
    • Using TDC Metrics to Make Decisions
    • Use a Recognized, Open Data Sharing Standard
  • What is the True Down Time Cost (TDC)?
    • Hidden Costs Unearthed and Revealed With TDC
    • Looking For The Overlooked!
    • Equipment Cost Categories (Constants)
    • Labor Cost Categories (Constants)
    • Downtime Cost Categories (Occurrence)
  • Action Plan
    • Overview of the Action Plan
    • Steps along the Way
    • Implementing Automated Data Collection
    • Motivating Management
    • See True Savings Resulting From The Programs You  Implement
    • Motivating Employees
    • Utilizing TDC in Daily Decisions
  • Resource Chapter
  • Frequently Asked Questions
  • Glossary
  • Appendix

 Price:  US$29.95 

 

Shop More

Automated download system is powered by our preferred method of payment, secure Pay Pal. (After purchase with 'Buy Now' button above, you immediately receive an email with download link.) If you prefer us to manually process your order or would like to mail or fax order in, please click CD and Book Order Form on our secure servers.

Click for manual order processing, all countries.

(Click on Credit card picture above for manual order processing. Your download link will be emailed within 24 hours with manual processing.)

Related Titles: 

"The True Cost of Downtime"

"The Japanese Path To Maintenance Excellence"

"Maintenance Policy and Procedures Manual"

"How to SMASH Maintenance Advisor e-book"

Please click here to contact us with your questions and comments. 

 

Go To Top of Page

HomeDatabaseLink to usResources  | Contents | Search | Advertise | Privacy Statement | AboutContact Us

Business Industrial Network was founded in 1995, Copyright © 1995 [Business Industrial Network]. 

2 Cityplace Drive, Suite 200, Saint Louis, MO 63141 - centrally located in the USA

573-547-5630

Website designed and hosted by BIN - All rights reserved. Revised: May 07, 2008.

Business Industrial Network makes no manner of an endorsement, representation or warranty regarding any contents located on this site. Viewers understands that any content or other information offered on or through BIN95.com are provided for informational purposes only. Viewers should evaluate any content or other information offered on or through BIN95.com in light of viewer's own individual circumstances. Business Industrial Network does not guarantee the accuracy, adequacy, completeness or availability of any content or other information offered on or through BIN95.com and is not responsible for any errors or omissions or for the results obtained from the use of any such content or other information. Other product names used herein are for identification purposes only and may be trademarks of their respective owners. Business Industrial Network disclaims any and all rights in those marks.